King Edward Court

Nottingham

Sector

Construction and M&E - New Build - Student Accommodation

Value

£140,000

Project Duration

34 weeks

68cbe8933b45f
11 08265 fusion nottingham
20250616
20250522
20250617

Project Information.

The Brief

King Edwards Court is a new build student accommodation development in Nottingham. Byond were brought in as the AV specialist as part of the M&E package, working alongside partner Nexsis Comms. The project was won through competitive tender — with Byond's design team engaging directly with the main contractor to define and refine the AV design and scope from the ground up.

What We Delivered

A fully integrated AV installation across the entire building — covering communal, social, fitness, and working spaces. Spaces included reception, a Forest Bar and Campsite social area, event space with projection and wireless microphone capability, wellness and fitness studios, a basketball court, private dining room, study lounge, bookable study rooms, and staff office. All audio zones are centrally managed and locally controllable, with QSys processing and Attero Tech zone control throughout, and a full distributed background music and paging system serving the building.

How We Worked

Byond were engaged at tender stage and worked with the main contractor throughout the construction phase to shape the final design. That early engagement meant AV requirements — containment, power, data, and structural fixings — were coordinated and built in rather than managed reactively at fit-out. Delivery was completed as part of the M&E package, in programme, alongside the wider building trades

The Outcome

A fully commissioned, centrally controlled AV environment across one of Nottingham's newest student developments — delivered on time, on scope, and as part of a coordinated M&E programmefrom day one

Zoned Music Throughout
Public Address System
Laser Projection
Control System